Planning Board meeting of October 14, 2020
COVID-19 Guidelines & Questionnaire
PB19-08 Heritage Village @ West Windsor
Application
- Project Booklet presented by Applicant at 9/23/2020 Hearing
- 2020-09-3019025 REVISED PRELIMINARY ARCHITECTURE
- 2020-10-02 Group Home
- Traffic - Group Home Analysis (10-2-20)
- 2020-10-02 West Windsor 3rd Resubmission
Phasing Plan
- Engineering Consultant report
- Consultant Reports
- 2020-08-31 15' Wide Drainage Easement Proposed Lot 15.02
- 2020-08-31 20' Wide Drainage Easement Lot 15.02
- 2020-08-31 35' Sidewalk-Landscape Easement Proposed Lot 15.02
- 2020-08-31 35' Sidewalk-Landscape Easement Proposed Lot 21.01
- 2020-08-31 Landscape Easement Proposed Lot 15.02
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (1 of 3)
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (2 of 3)
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (3 of 3)
Legal Descriptions
- 2020-08-31 15' Wide Drainage Easement Proposed Lot 15.02
- 2020-08-31 20' Wide Drainage Easement Lot 15.02
- 2020-08-31 35' Sidewalk-Landscape Easement Proposed Lot 15.02
- 2020-08-31 35' Sidewalk-Landscape Easement Proposed Lot 21.01
- 2020-08-31 Landscape Easement Proposed Lot 15.02
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (1 of 3)
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (2 of 3)
- 2020-08-31 ROW Dedication Proposed Lot 15.02 (3 of 3)
- 2019-10-30 NJDEP LOI
- 2020-01-30 Geotechnical Report
- 2020-03-05 Application Form SIGNED
- 2020-03-05-DA Maps
- 2020-07-10-Phasing Plan (002)
- 2020-08-24 O&M Manual
- 2020-08-26REFILE PRELIM ARCHBP1902517
- 2020-08-31 - Sanitary Sewer Report
- 2020-08-31 APR-184 Rev.Major Subdivision (Deed Rotation)
- 2020-08-31 Arora - Traffic - 2nd Response
- 2020-08-31 Burgis - Planning - 2nd Response
- 2020-08-31 Environmental Impact Statement
- 2020-08-31 Site Plan
- 2020-08-31 Snow Storage
- 2020-08-31 SWM Report
- 2020-08-31 Turning Plans
- 2020-08-31 West Windsor 2nd Resubmission
- 2020-08-31 West Windsor Twp - List of Waivers
- 2020-08-31 WW Twp - COAH - 2nd Response
- 2020-08-31 WW Twp - Engineering - 2nd Response
- 2020-08-31MBAHeritageWestWindsor-Clubhouse&AmenityPlan
- 11109.011 ASH RPT Capacity Analysis (2020-08-28)
- 18196A - Township Response (8-27-20)
- 18196A Final Traffic Assessment (8-21-20)
- Overall Wetlands Survey July 7 No Update
- Owner Affidavit SIGNED
- Site Plan Checklist
- Subdivision Checklist