Checklist for Required Residential Inspections
THE OWNER OR OTHER RESPONSIBLE PERSON IN CHARGE OF WORK MUST NOTIFY THIS AGENCY WHEN WORK IS READY FOR ANY REQUIRED INSPECTIONS.
WHEN PERMITS ARE ISSUED, A COPY OF THE SUBCODE FORMS ARE GIVEN TO THE APPLICANT. THESE FORMS HAVE A SECTION ENTITLED “JOB SUMMARY”. IN THIS SECTION THE SUBCODE OFFICIAL CIRCLES THE REQUIRED INSPECTIONS OR WRITES IN ANY THAT MAY BE PROJECT SPECIFIC.
REQUESTS FOR INSPECTIONS MUST BE MADE AT LEAST 24 HOURS PRIOR TO INSPECTION. YOU MUST CALL THE OFFICE BEFORE 4:30PM TO SCHEDULE AN INSPECTION ON FOR THE FOLLOWING DAY. INSPECTIONS WILL BE PERFORMED WITHIN 3 BUSINESS DAYS.
EVERY PROPERTY TO BE INSPECTED SHALL BE PROPERLY IDENTIFIED OR NO INSPECTION WILL BE PERFORMED. A COMPLETE COPY OF APPROVED PLANS MUST BE KEPT ON THE JOB SITE FOR THE INSPECTORS USE. BEFORE OUR OFFICE WILL ACCEPT AND APPLICATION FOR A C OF O, ALL REQUIRED FINAL INSPECTIONS MUST BE COMPLETED AND APPROVED.
B IS BUILDING, E IS ELECTRIC , P IS PLUMBING , F IS FIRE
ADDITIONS/GARAGES: B Footing, B Backfill, B Slab, B Framing, B Sheathing, E Rough, P Rough (If Installed) B, Insulation, B, E, P, F Final
BACKFLOW PREVENTER: P Final (Inside of House)
BASEMENT: B Framing, E Rough, P Rough (If Installing ) B Insulation (If Installing) B, E, P, F Final
DECK: B Footing, B Framing , B Final
FENCE: B Final
FURNACE: B, E, F, P Final
GAS LOG SET: P Gas Test, B, P Final
HOT TUB: B, E Final
POOL INGROUND: B Footing, B Collar, B Steel, E Trench, E Bonding, P Gas Pipe (If there is a heater) B, E, P Final - Call Engineering for Final Grading 799-9396
RADON: B, E Final
ROOF & SIDING: B Final
SEWER CONNECTION: P Trench, P Final
SHED: Under 200sq. ft. B Final, Over 200sq. ft. B Footing B Final
SIGNAGE: B Footing (If Required) B, E Final
SINGLE FAMILY DWELLING: B Footing, B Foundation, B Backfill (need location survey), P Sewer & Water Service, B Basement Slab, B Garage Slab, P Gaspipe, B Framing, B Sheathing , E Rough, P Rough, B Insulation, B, E, P , F Final
TANK: Underground Storage B Rough and Final (Tank out of ground, hole open ) Oil Tank Placement B, F, P, Final
WATER CONNECTION: P Trench, P Final